CDCL6010EVM evaluation module for CDCL6010 which is a 1:11 high-performance, low phase noise clock synthesizer
Referenzdesign unter Verwendung des Teils CDCL6010 von Texas Instruments
Zugehörige Dokumente
Für Endprodukte
- Clock and Timing Devices
Beschreibung
- CDCL6010EVM, is an evaluation module designed to aid in evaluating the performance of the CDCL6010, which is a 1:11 high-performance, low phase noise clock synthesizer that synchronizes its on-chip voltage controlled oscillator (VCO) frequency to an external reference clock, generates low phase noise (jitter) clock. The PLL loop bandwidth and damping factor can be modified by changing the on-board passive loop filter components to meet different system requirements. The input divider, feedback divider and output dividers are done through the programming interface. As the system requires external components like a microcontroller to aid in programming the device and a very clean power supply for the device, this EVM provides an excellent way to evaluate and modify the performance and parameters of the clock system in conjunction with the specific customer application
Haupteigenschaften
-
Output Frequency30 to 325 MHz
Empfohlene Bauteile (46)
Teilenummer | Hersteller | Typ | Beschreibung | |||
---|---|---|---|---|---|---|
|
TPS75701KC | Texas Instruments | Linear Regulators | LDO Regulator Pos 1.22V to 5V 3A 5-Pin(5+Tab) TO-220 Tube | In den Warenkorb | |
|
24LC512-I/ST14G | Microchip Technology | EEPROM | EEPROM Serial-I2C 512K-bit 64K x 8 3.3V/5V 14-Pin TSSOP Tube | In den Warenkorb | |
|
24LC512-I/ST | Microchip Technology | EEPROM | EEPROM Serial-I2C 512K-bit 64K x 8 3.3V/5V 8-Pin TSSOP Tube | In den Warenkorb | |
|
24LC512-I/ST14 | Microchip Technology | EEPROM | EEPROM Serial-I2C 512K-bit 64K x 8 3.3V/5V 14-Pin TSSOP Tube | In den Warenkorb | |
|
24LC512T-I/SM | Microchip Technology | EEPROM | EEPROM Serial-I2C 512K-bit 64K x 8 3.3V/5V 8-Pin SOIJ T/R | In den Warenkorb | |
|
24LC512T-I/ST | Microchip Technology | EEPROM | EEPROM Serial-I2C 512K-bit 64K x 8 3.3V/5V 8-Pin TSSOP T/R | In den Warenkorb | |
|
24LC512-E/ST14 | Microchip Technology | EEPROM | EEPROM Serial-I2C 512K-bit 64K x 8 3.3V/5V 14-Pin TSSOP Tube Automotive AEC-Q100 | In den Warenkorb | |
|
MAX3373EEKA+T | Analog Devices | Level Translators | Voltage Level Translator 2-CH Bidirectional 8-Pin SOT-23 T/R | In den Warenkorb | |
|
24LC512T-I/MS | Microchip Technology | EEPROM | EEPROM Serial-I2C 512K-bit 64K x 8 3.3V/5V 8-Pin SOIJ T/R | In den Warenkorb | |
|
TPS75701KTTR | Texas Instruments | Linear Regulators | LDO Regulator Pos 1.22V to 5V 3A 6-Pin(5+Tab) DDPAK T/R | In den Warenkorb | |
|
24LC512T-E/MF | Microchip Technology | EEPROM | EEPROM Serial-I2C 512K-bit 64K x 8 3.3V/5V 8-Pin DFN-S EP T/R Automotive AEC-Q100 | In den Warenkorb | |
|
MAX3373EEBL+ | Analog Devices | Level Translators | Voltage Level Translator 2-CH Bidirectional 9-Pin UCSP T/R | In den Warenkorb |