STEVAL-MKI126V1, Smart Voice Demonstration Board based on MP45DT02
Referenzdesign unter Verwendung des Teils MP45DT02 von STMicroelectronics
Beschreibung
- STEVAL-MKI126V1, Demonstration Board allows connection of up to six microphones using sockets provided, or through connection of a dedicated six-microphone array. The digital interface of the board allows the interfacing of the MIC output to the most widely used audio receivers and digital amplifiers, or permits evaluation of the MIC with generic audio measurement equipment
Empfohlene Bauteile (7)
| Teilenummer | Hersteller | Typ | Beschreibung | |||
|---|---|---|---|---|---|---|
|
|
STG719STR | STMicroelectronics | Analog Switch Multiplexers | Analog Switch Single SPDT 6-Pin SOT-23 T/R | In den Warenkorb | |
|
|
LDS3985M18R | STMicroelectronics | Linear Regulators | LDO Regulator Pos 1.8V 0.3A 5-Pin SOT-23 T/R | In den Warenkorb | |
|
|
LD1117S33TR | 4-Pin LDO Linear Regulator | STMicroelectronics | Linear Regulators | LDO Regulator Pos 3.3V 1.3A 4-Pin(3+Tab) SOT-223 T/R | In den Warenkorb | |
|
|
LD1117S33CTR Low Drop Out 3.3V linear regulator in a SOT-223 SMD Package | STMicroelectronics | Linear Regulators | LDO Regulator Pos 3.3V 1.3A 4-Pin(3+Tab) SOT-223 T/R | In den Warenkorb | |
|
|
ST2378ETTR | STMicroelectronics | Level Translators | Voltage Level Translator 8-CH Bidirectional 20-Pin TSSOP T/R | In den Warenkorb | |
|
|
TS482IST | STMicroelectronics | Audio Amplifiers | Audio Amp Headphone 2-CH Stereo 0.107W Class-AB 8-Pin MSOP T/R | In den Warenkorb | |
|
|
STA321MPL | STMicroelectronics | Audio Processors | Audio Processor Bass/Treble 64-Pin TQFP | In den Warenkorb | |